OUR GROWTH

PHASE 1

Exploration & Resource Definition

We began by securing prime licenses in Zambia and conducting extensive geophysical surveys, mapping, and geochemical sampling.

This groundwork ensures Orein is ready to move directly into production-scale development.

• 100+ ore tests completed in accredited labs.

• Consistent confirmation of gold, copper, and PGM potential.

• High-confidence geological models built to define reserves.

PHASE 2

Pilot MPL (240 MTPD)

A Certified Pilot Mineral Processing License (MPL) was established with 240 MTPD capacity.

• Pilot plant tested multiple ore bodies.

• Metallurgical flowsheets validated and optimized.

• Recovery efficiency proven through small-scale runs.

This step bridged exploration results with operational

reality, de-risking our transition to full scale.

PHASE 3

Scale-Up: 1,000 TPD CIL Plant (Rufunsa Flagship L2)

With exploration and pilot data complete, we are now ready to commission our 1,000 TPD Carbon-in-Leach (CIL) facility.

This flagship operation transforms Orein into a large-scale sustainable gold producer.

• Designed with state-of-the-art crushing, milling, leaching, and gold recovery circuits.

• Environmentally responsible design, tailings management, and water recycling included.

PHASE 4

Advanced PGM & Copper Facilities

Following gold, Orein will expand into Zambia’s first advanced PGM processing plant and integrate copper operations.

• Focused on Iridium, Rhodium, Palladium, and Platinum recovery.

• Copper beneficiation and refining circuits developed in parallel.

This diversification enhances resilience, scales revenues, and secures Orein’s role as a multi-metal leader in Africa.

PHASE 5

Financial Growth & IPO

With multiple operations running, Orein will strengthen its financial books and prepare for a landmark IPO at the London Metal Exchange (LME).

• Transparent governance and audited reserves.

• Investor confidence built on proven results.

This milestone places Orein among the top emerging global mining companies.

PHASE 6

Target: Sustainable Legacy

The ultimate vision is to deliver 10x investor growth while setting Africa’s benchmark for sustainable mining.

• Protecting nature through responsible operations.

• Creating long-term community value.

• Building a legacy of innovation and entrepreneurship.

EXPLORATION

Our approach combines modern

geophysical surveys, geochemical sampling,

and advanced satellite data analysis to

identify high-potential mineralized zones.

PILOT MPL FACILITY

This facility allows us to test ore from different deposits, validate metallurgical flowsheets, and optimize recovery rates before scaling up to full production.

SCALE-UP

This facility is designed to integrate state-of-the-art crushing, milling, leaching, and recovery circuits, ensuring high gold and PGM recovery with strict environmental compliance.

FUTURE EXPANSIONS

Future Expansion Beyond the 1,000 TPD CIL plant, Orein Resources is preparing for strategic expansion into Advanced PGM and Copper Mining.